top of page

Company details

Processes & Services

3S Bridge 

All fabrication is done using high-quality, high-strength steel that meets or exceeds the requirements of international bridge codes. Work is conducted in compliance with European, North American, and Asian quality control and workmanship codes, including ASTM, AASHTO and EN1090. The factory has multiple quality certificates, such as ISO 9001 plus environmental and health and safety certificates ISO 14001 and ISO 45001.

The fabricated components are hot dipped galvanized for extended life and durability. The thickness of this coating is checked to ensure the bridges are protected in the harshest locations.

3S Bridge has worked with multiple independent quality management and inspection companies that include SGS and TUV.

3S Panel Bridge Fabrication

We can provide and interconnect any of the following bolt-on services to our bridge build service to ensure a successful, high quality completion:

Define the requirement

  • Traffic studies

  • River Hydraulics

  • Topographical survey

  • Geotechnical Survey

  • Site access​

Design

  • Superstructure

  • Substructure

  • Profile and geometry

  • Compliant with leading codes

  • Constructability

Logistics

  • Delivery coordination

  • Packing 

  • Ocean freight

  • Over land Transportation

  • Handling  

Site Supervision

  • Resource Planning

  • Sequencing 

  • Methodology

  • Quality Control   

Building bridges is at the core of all our projects. To complete projects with you faster and more easily, we offer both project management and bolt-on expert services.

In addition to bridge design and manufacture, we can supply or source all services connected with installation to ensure the success of your bridge project.

Bolt-on Services

“We would fully recommend 3S Bridge, LLC to any potential client and have no hesitation in working with them in the future.”
“We are pleased to confirm that in all areas above 3S Bridge met or exceeded the specifications and work order” 

Simon Daniel  

Deputy Permanent Secretary – St. Lucia 

“3S Bridge, LLC of the United States supplied the steel structure, and we can confirm that they supplied the bridge in Full compliance” 
“The complexity of the superstructure would also prove to be particularly challenging to assemble and install. 3S Bridge’s site support during the preassembly phase was valuable to ensure the correct profile was achieved”

Luis Campana

President, Grupo Cotrans – Panama   

BRIDGES OF PEACE PROGRAMME

"The bridges have positively impacted on the quality of life and economic revival of our remote communities."

Dr Omar Rangel

Development - Bolivar State, Colombia

“For the community the bridges are also synonymous with safety. The poor condition of the roads and previous inadequate structures forced them to take unsafe alternative routes. Now they can travel in safety and over shorter distances.” 

Diana Manrique

Secretary of Infrastructure, Bolivar State, Colombia

Client feedback

bottom of page